Bounce
a Lot Castles (
Terms and Conditions of Hire
Item(s) __________________________12 x
12 Bouncy Castle______________________________
Principle Hirer
______________________________________________________________________
Address____________________________________________________________________________
___________________________________________________________________________________
The indemnity granted to the supplier under their Public Liability
policy will not apply in connection with the legal liability for claims arising
out of injury to persons, or damage to property, where these terms and
conditions are not observed.
1. Height
Nobody over
. 5 Foot
. is allowed to use the equipment.
2. Weight
Nobody over the weight of
..8 stone
is allowed to use the
equipment.
3. Age
Nobody over the age of
.12
. is allowed to use the equipment.
4. Where it is allowed under
condition number 3 each person using the equipment who is over the age of 18
should sign the attached waiver before using the equipment provided except
where the hired equipment is being supervised by the supplier.
5. The supplier should determine
the minimum number of attendants needed to operate the device safely, and
ensure that at least this number is on duty when the device is in operation. A
minimum number of attendants needed to operate the device safely is
One
..
.
6. Alcohol
It is required that the supervisor allow that no person under the influence
of Alcohol be allowed to use the equipment at any time.
7. Suppliers Responsibility If you have any reason to believe that the
equipment has not been supplied in accordance with the below summary of HSE PM
76, do not sign these terms and conditions until you are satisfied the
equipment is safe for use.
8. Weather
The above equipment has been designed for use in indoor/outdoor conditions.
However when wet the equipment may become slippery and therefore increase the
possibility of injury to the users. In such cases the equipment should not be
used. Where there are high winds the equipment should be deflated.
9. Responsibility for
loss/damage The Principle hirer accepts full and complete responsibility for
all loss or damage to the above stated equipment whilst it is under their
custody and control.
10. HSE PM 76 The equipment as stated above should be erected, operated,
supervised and used in accordance with the Guidelines as set out in HSE PM 76,
a summary of the relevant sections of which are attached as part of these Term
and Conditions of Hire.
11. The undersigned person who is
over 18 years of age agrees as principle hirer of the above equipment to
enforce the above terms and conditions.
12.
The above terms and condition
to prevail over all others implied or written, at all times.
HSE PM 76
Summary
Suppliers/erectors
responsibility
It is a condition of the
Policy under which the Indemnity is being granted that the following inspection
is carried out by the erector and such inspection should include:-
a)
All anchor points are intact and not damaged.
b)
Anchor ropes are not worn or chaffed.
c)
Anchor stakes and their location remain sound for continued use.
d)
The wall to tower fixings are not torn.
e)
There are no holes or rips in the surface or seams of the bed and
step/front apron.
f)
When fully inflated all walls and towers (when fitted) are firm and
upright and the pressure in the bed and step/front apron are sufficient to give
a reliable and firm footing.
g)
The blower has no exposed wires or lose bolts, screws etc and that the
mesh guards over the air inlet and outlet are secured and intact.
h)
Electric cables are not worn or chaffed and that plugs, sockets and
switches are not damaged.
Hirers/supervisors
responsibility
1. Ensure that all users remove
their footwear (except socks) and any other hard, sharp or dangerous objects
from their persons such
as buckles, pens, purses
etc. Spectacles are best removed.
2. Not allow anyone to bounce on
steps/front apron.
3. Not allow anyone to climb or
hang on the outside walls.
4. Not allow users who are
taller than the outside walls when standing on the inflated bouncing surface to
use the device.
5. The operators should be
proactive and use a whistle or other device and take action at the first sign
of any misbehaviour.
6. Ensure that the equipment is
not overloaded.
7. Larger or more boisterous
children should be segregated from small ones and a number of users at any one
time should be limited to that figure which allows each user enough room to
play safely.
8. Periodically check anchor
stakes for movement and ensure they remain secure.
Signed____________________________Name_______________________________Date_____________